Australia’s Biggest Planned Hydrogen Project Scrapped

Date:

Australia’s Biggest Planned Hydrogen Project Scrapped

A hydrogen station at BlueScope Steelworks in Port Kembla, Wollongong, Australia, on Feb. 9, 2024. AAP Image/Dean Lewins

State-owned energy company Stanwell has announced it will withdraw from a planned hydrogen project bound for the regional Queensland city of Gladstone, as well as all other hydrogen developments.

The $14.75 billion (US $9.6 billion) CQ-H2 project was intended to be a main player in the federal Labor government’s net zero arsenal, with a predicted output of 200 tonnes of renewable liquified hydrogen by 2029, before producing up to 800 tonnes daily by the early 2030s.

spot_imgspot_imgspot_img

Share post:

More like this
Related

Typhoon Dolphin Brings Heavy Rain to Northern Taiwan During Its Approach to China

Typhoon Dolphin brings heavy rain to northern Taiwan as...

US Forces Have Diverted 53 Ships Since Resuming Iran Blockade, CENTCOM Says

U.S. Marines from the 11th Marine Expeditionary Unit conduct...

Beijing Sanctions 2 US Labs That Can Prove Where Cotton Grew

This photo taken on Sept. 20, 2015 shows Chinese...

Childs Refusal to Wear Seatbelt Leads to Toronto-Bound Flight Being Cancelled

A Porter plane taxis at the airport in Ottawa,...