6.2 C
Ottawa
Wednesday, March 4, 2026

US Nuclear Energy Industry Poised to Power Up, but Bottlenecks Loom

Date:

An architectural rendering of Fermi America’s proposed 5,770-acre data center complex near Amarillo, Texas, illustrates its plans for 18 million-square-feet of AI data center development fueled by “the largest nuclear power complex in America” supported by “the nation’s biggest combined-cycle natural gas project, solar power, and battery storage.” Courtesy of Fermi AmericaTen companies are developing “first mover” nuclear energy innovations in breakneck bids to achieve “criticality” by July 4, 2026, to secure federal funding in advancing their technologies under an Energy Reactor Pilot Program authorized by President Donald Trump.“I doubt they will all make it,” Idaho National Laboratory Director John Wagner said. “But the thing that’s really exciting is that I do think three can make it, and the others will follow quickly thereafter.”

spot_imgspot_imgspot_img

Share post:

More like this
Related

US Military Planes Transporting Americans From Middle East, Top General Says

Chairman of the Joint Chiefs of Staff Gen. Dan...

How Operation Epic Fury Unfolded

The Pentagon, restrained for decades from attacking Iran, needed...

China Remains No. 1 Source of Counterfeit Products Globally: Report

The theft of U.S. intellectual property is one of...

US Private Payrolls Up 63,000 in February, Highest Since July: ADP

Economy‘We’ve seen an increase in hiring and pay gains...