2.3 C
Ottawa
Wednesday, January 14, 2026

US Nuclear Energy Industry Poised to Power Up, but Bottlenecks Loom

Date:

An architectural rendering of Fermi America’s proposed 5,770-acre data center complex near Amarillo, Texas, illustrates its plans for 18 million-square-feet of AI data center development fueled by “the largest nuclear power complex in America” supported by “the nation’s biggest combined-cycle natural gas project, solar power, and battery storage.” Courtesy of Fermi AmericaTen companies are developing “first mover” nuclear energy innovations in breakneck bids to achieve “criticality” by July 4, 2026, to secure federal funding in advancing their technologies under an Energy Reactor Pilot Program authorized by President Donald Trump.“I doubt they will all make it,” Idaho National Laboratory Director John Wagner said. “But the thing that’s really exciting is that I do think three can make it, and the others will follow quickly thereafter.”

spot_imgspot_imgspot_img

Share post:

More like this
Related

Made-in-China Air Bags Blamed in 8 Drivers Deaths

A deployed airbag in a car in a file...

Former US Navy Sailor Sentenced to Nearly 17 Years in Prison for Selling Military Secrets to China

The Department of Justice in Washington on Feb. 12,...

Some Major Market Events Loom This January

President Donald Trump (R) speaks with Director of the...

Starlink Activates Free Internet Access in Iran Amid Violent Crackdown, Nonprofit Says

Iranian demonstrators gather in a street during a protest...