Solar Farms May Be Forced to Cut Output Due to Grid Constraints, AEMO Warns

Date:

Solar Farms May Be Forced to Cut Output Due to Grid Constraints, AEMO Warns

Solar panels are seen on a roof in Albany, Western Australia, on March 29, 2024. Susan Mortimer/The Epoch Times

Australia’s energy market operator has raised concerns that some large new solar farms may be forced to scale back or shut down during peak generation hours due to a lack of transmission infrastructure.

In a new report, the Australian Energy Market Operator (AEMO) found that some hypothetical 300-megawatt solar farms—especially in parts of Victoria and South Australia—could be forced to reduce output during peak generation hours because of grid congestion.

spot_imgspot_imgspot_img

Share post:

More like this
Related

How US Is Using Iran War to Squeeze China Ahead of TrumpXi Summit

|May 11, 2026Updated:May 11, 2026As the United States ups...

5 Australians to Face Quarantine on Return From Hantavirus Hit Cruise Ship

illustration of a hantavirus testing concept with laboratory tubes...

Bail Application Delayed for ISIS Brides on Slavery Charges

A group of ISIS-linked women and C returning from...

Trump Says Polish, Moldovan Detainees Released by Belarus, Russia With US Help

EuropePresident Donald Trump said that Polish President Karol Nawrocki...