-14.7 C
Ottawa
Monday, January 26, 2026

70,000-Tonne China-Built Gas Platform for Woodside Set to Arrive Later This Year

Date:

70,000-Tonne China-Built Gas Platform for Woodside Set to Arrive Later This Year

The onshore part of Woodside’s Pluto LNG project. Courtesy of Woodside

Woodside Energy’s latest floating gas platform, to be deployed as part of the expanded Scarborough Gas Project, has been built in China.

The 70,000-tonne structure, around the size of a rugby field (100 metres long and 70 metres wide), will be floated to a site 375 kilometres off the Western Australian coast later this year in a journey likely to take 40 days.

spot_imgspot_imgspot_img

Share post:

More like this
Related

Southwest Airlines Ends Open Seating, Moves to Reservation-Based System

A plane takes off from Reagan National Airport in...

USA Rare Earth Lines Up $3.1 Billion Public, Private Funding to Fast-Track Mining Operations

Round Top rare-earth mineral deposit in West Texas. Courtesy...

Home-Purchase Cancellations Hit Record High in December: Redfin

A sign is posted in front of a home...

Trump Says Reciprocal Tariffs on South Korea Will Be Raised to 25 Percent

The president said that the increase to 25 percent...