The U.S. military is now on high alert, a secret operation that has been kept secret for months. Multiple intelligence sources confirmed the strategic satellite domains at 12:40 am, redirecting all data to secure the MILSAT scope. This type of transformation only happens during emergency operations – and it happened tonight without public announcement.
Meanwhile, internal reports have officially revealed the long-awaited “QFS load increase – 1st December” activation. This is not a test, but the first global synchronization of quantum records, contract and financial pathways. For several months, teams have been concentrating on underground data plants, preparing the mass channels for a massive transfer of energy that cannot be interrupted by outside forces.
Last night, at 11:40 pm, a test was conducted on the Level 4B corridor, where selected participants transferred money without any delay or failure rate. The internal report contained only one line in his final summary: “The corridor is stable.” These words sums it up. She confirms that the system is working, functioning efficiently, and ready for public activation on a large scale.
Underground medical complexes have also been put in a ‘green’ state, allowing for advance deployment of advanced regeneration systems. It came out 48 hours ago, and operators were instructed to start phase one of the “National Restoration Program.” These are not standard field hospitals, but advanced medical units designed to handle high-priority regeneration cases when the civil healthcare system stops working.
Another important protocol activated:
“Civil network closure protocol.”
This is a controlled transition, where civic media, corporate news, and private digital platforms are gradually losing access. You will notice signal interruptions, limited app functions, and unjustified service interruptions. All of this is not accidental, but part of the process of safely transitioning to the new quantum network.
The final phase of the operation will be the activation of the “10-day protection mode”. During this time, expect temporary communications outages, closures of institutional media channels, and direct military control of all national broadcasting structures. This is the period of protection required for QFS wave to complete the global certification cycle.
Every system is heading towards a specific destination:
QFS. Deployment of a Medical Family Keeping an eye on melsat. A national reboot.
The transition cannot be stopped.
The old world is falling apart. New network is online
We’re on the cusp of a first real global reset – and the signs are no longer hidden.
This is the dawn of a new era.




