-10 C
Ottawa
Thursday, December 11, 2025

70,000-Tonne China-Built Gas Platform for Woodside Set to Arrive Later This Year

Date:

70,000-Tonne China-Built Gas Platform for Woodside Set to Arrive Later This Year

The onshore part of Woodside’s Pluto LNG project. Courtesy of Woodside

Woodside Energy’s latest floating gas platform, to be deployed as part of the expanded Scarborough Gas Project, has been built in China.

The 70,000-tonne structure, around the size of a rugby field (100 metres long and 70 metres wide), will be floated to a site 375 kilometres off the Western Australian coast later this year in a journey likely to take 40 days.

About the author: Rex Widerstrom
Tell us something about yourself.
spot_imgspot_imgspot_img

Share post:

More like this
Related

Lululemon CEO to Step Down in January as US Sales Decrease

Calvin McDonald, CEO of Lululemon Athletica, on the floor...

Instacarts AI Program Changes Pricing on Identical Goods, Study Finds

A photo illustration of the Instacart logo. Justin Sullivan/Getty...

Florida Sues Starbucks Over DEI Policies

The Starbucks sign at a Starbucks kiosk in the...

Trumps National Security Strategy a Wake-Up Call for Europe to Step Up: Latvias Foreign Minister

Latvian Foreign Minister Baiba Braze addresses a press conference...