70,000-Tonne China-Built Gas Platform for Woodside Set to Arrive Later This Year

Date:

70,000-Tonne China-Built Gas Platform for Woodside Set to Arrive Later This Year

The onshore part of Woodside’s Pluto LNG project. Courtesy of Woodside

Woodside Energy’s latest floating gas platform, to be deployed as part of the expanded Scarborough Gas Project, has been built in China.

The 70,000-tonne structure, around the size of a rugby field (100 metres long and 70 metres wide), will be floated to a site 375 kilometres off the Western Australian coast later this year in a journey likely to take 40 days.

spot_imgspot_imgspot_img

Share post:

More like this
Related

How the US Can Adjust to Middle East Oil Disruptions

|March 13, 2026Updated:March 13, 2026The U.S.–Israeli war with Iran...

Celebrity Chef Ren Redzepi Resigns From Iconic Danish Restaurant Noma After Abuse Allegations

Danish chef René Redzepi in London on April 29,...

Man in Australia Charged Over Nazi Symbol and Online Threat

Crime and Public SafetyPolice say the charges stem from...

Senate Committee Probes Anthropic on Why Hundreds of Pauline Hanson Deepfakes Flooding the Web

Leader of One Nation Senator Pauline Hanson speaks to...