70,000-Tonne China-Built Gas Platform for Woodside Set to Arrive Later This Year

Date:

70,000-Tonne China-Built Gas Platform for Woodside Set to Arrive Later This Year

The onshore part of Woodside’s Pluto LNG project. Courtesy of Woodside

Woodside Energy’s latest floating gas platform, to be deployed as part of the expanded Scarborough Gas Project, has been built in China.

The 70,000-tonne structure, around the size of a rugby field (100 metres long and 70 metres wide), will be floated to a site 375 kilometres off the Western Australian coast later this year in a journey likely to take 40 days.

spot_imgspot_imgspot_img

Share post:

More like this
Related

California to Raise Minimum Wage to $17.40 in 2027

California Gov. Gavin Newsom speaks at a press conference...

Renewed Red Sea Standoff Underscores Persistent Threat Posed By Yemens Houthis

The oil tanker Encelia was sailing in the Red...

Days After Historic Border Breach in Spain, Illegal Migrants Remain Scattered Across Ceuta

CEUTA, Spain—By Aug. 1, the beach where tens of...

Its a Responsibility: Animals Moved out as BC Fire Risk Looms

Will Unruh says the 13 bison he cares for...